Fire Alarm system requirements for Co-generation projects are not only sophisticated but very critical from a Safety and Plant Operating perspective.
The components and wiring methods for these types of projects
varied from system to system and included the following:
This project presented many challenges as real estate was at a premium regarding locations for installation of conduit and equipment.
Procon stayed ahead of schedule and completed our scope of work well ahead of time.